What happened in Appleton
This Appleton job was a water emergency opened on April 15, 2026. The crew logged 163 photos, and the ones here are from April 19 and 20.
The work was in the basement. One side is unfinished, with a concrete floor and open joists, and on the finished side the baseboards were off and the bottom of the drywall exposed. The crew took meter readings on the drywall, the bottom plates and the concrete, and several photos show the meter resting on the written moisture log, where each reading was recorded by location and date.
A dehumidifier was running in the unfinished part of the basement.
Work performed
- Water emergency response
- Baseboards removed on the finished side
- Moisture readings on drywall, bottom plates and concrete
- Written moisture log kept by location and date
- Dehumidifier drying