What happened in Suring
This Suring job was logged as a Category 3 water loss, the classification for contaminated water such as sewage or floodwater. The job was opened on April 20, 2026, and the crew documented it with 222 photos. The ones here are from April 30.
Inside, the flooring had been stripped down to the subfloor and the drywall cut out along the bottom of the walls, leaving the studs open. In the bathroom the fixtures were pulled out. With contaminated water, porous materials it touched generally have to be removed rather than dried in place.
The crew also went under the floor, where the photos show the plumbing lines, the insulation and the underside barrier being checked for water.
Work performed
- Category 3 water response
- Flooring removed to the subfloor
- Lower drywall cut out to the studs
- Bathroom fixtures pulled
- Inspection of plumbing and insulation under the floor