What happened in Sheboygan
This Sheboygan bathroom was approved for mold remediation, and the crew documented the work with 23 photos on February 26, 2026.
The walls around the bathtub had been opened to the studs, exposing the framing, the shower valve and plumbing, and the back side of the neighboring wall. The photos show a crew member spraying treatment into each stud bay with a wand sprayer, working along the tub wall, around the valve, and into the tiled section where the wall was cut open. The ceiling above the tub was treated too.
Water that gets behind a tub surround can sit in the wall for a long time before anything shows on the bathroom side.
Work performed
- Tub surround walls opened to the studs
- Treatment sprayed into each stud bay
- Work around the shower valve and plumbing
- Ceiling above the tub treated