What happened in Sheboygan
This Sheboygan job was approved for mold remediation, and the crew documented it with 17 photos on February 26, 2026.
The work was in an unfinished corner of the basement near the floor drain and a plumbing line. Once the floor mat and a loose sheet of flooring were pulled up, the concrete underneath showed heavy dark staining spreading out from the drain and along the walls. Plywood panels mounted on the wall had the same discoloration along their lower edges, and one panel was taken down to check behind it.
The area around a floor drain tends to stay damp, and a mat or sheet of flooring left over the concrete holds that moisture in.
Work performed
- Floor mat and loose flooring pulled up
- Inspection of concrete around the floor drain
- Wall panel removed to check behind it
- Mold remediation of the affected corner