What happened in Wequiock
This basement in the Wequiock area of Green Bay was approved for mold remediation. The crew opened the job on March 6, 2026, and logged 53 photos.
The photos here are from that first day. The basement is unfinished, with painted foundation walls, open floor joists overhead and a concrete floor, plus storage shelving and a workbench along the walls. A framed wall section near the stairs has its drywall off, leaving the studs exposed.
The crew photographed each wall from the floor up to the joists so the starting condition of the basement was on record before the remediation work.
Work performed
- Walkthrough and photo record of the unfinished basement
- Framed wall section opened to the studs
- Mold remediation of the basement