What happened in Seymour
CCS took on this fire job in Seymour in January 2025 and logged 288 photos over the course of the work. The photos here come from the rebuild in April and May 2025.
By May the inside was close to finished. New double-hung windows were in, each cased in stained wood trim. New black panel doors were hung with matching stained casing, and the walls were painted white. The attic access hatch in the ceiling got a new panel and a stained wood frame to match the rest of the trim.
Fire jobs usually end this way. After the cleanup and tear-out, the last stage is putting the rooms back together so the home is livable again.
Work performed
- Fire damage rebuild
- New windows with stained wood casing
- New interior doors and trim
- Attic hatch panel and trim



