What happened in Manitowoc
CCS inspected this Manitowoc basement on June 18, 2026, as a free mold assessment, and documented it with 17 photos. The owner received a written estimate for remediation.
The basement is finished with dark wood paneling, a drop ceiling and carpet, with a kitchenette, a sitting room and storage along one side. In one corner a sheet of plastic leans against the paneling, and the crew photographed the base of that wall and the corner closely. The rest of the photos walk through each room to record its condition and contents.
Wood paneling over a basement wall can hide moisture and mold on its back side, so the corners and wall bases get the closest look.
Work performed
- Free mold assessment of the basement
- Close inspection of the paneled corners and wall bases
- Written remediation estimate



