What happened in Greenleaf
CCS opened this bathroom mold remediation job in Greenleaf on May 30, 2025, and has 41 photos. The set here is from June 17.
The lower walls in the bathroom had been opened to the studs, exposing the bottom plates and the back of the wall around the tub and the plumbing. A crew member treated the framing and the plates with a spray wand while drop cloths covered the floor. Patches of compound showed where the remaining drywall would be repaired.
Later the same day the photos show new light wood-look flooring installed through the bathroom and into the hallway, fitted up to the toilet, the vanity and the door trim. One close-up shows the new flooring meeting the concrete at the edge. An access opening in the wall was also photographed with the plumbing lines visible. Replacing the flooring after the mold work finishes the room so it can go back into use.
Work performed
- Mold remediation
- Lower walls opened to the studs
- Framing treated with a spray wand
- New wood-look flooring installed