What happened in Appleton
CCS opened this basement mold job in Appleton on April 21, 2025, and logged 30 photos. The first photo here is from April 28 and the rest are from May 5.
The basement has painted concrete block walls, and the bottom few courses were covered in dark mold, heaviest in the corners and around the floor drain and the pit in the floor. Before the work, the walls were lined with metal shelving and stored tools.
On May 5 the crew cleared the contents out in black contractor bags and emptied the wood shelving. With the walls open to reach, a gloved crew member used a spray wand to treat the block along the base of the wall and around the pipes and the pit. Block walls pull moisture through from the soil outside, so the lowest courses and the corners stay damp and grow mold first.
Work performed
- Basement mold remediation
- Contents bagged and removed
- Shelving cleared from the walls
- Block walls treated with a spray wand
Photos labeled Before and After were taken by the CCS crew on this job.



